How to fill a liquid floor

How to fill a liquid floor

Increasingly, liquid bulk floors begin to use the interior design. This original and modern coating is used in offices, salons, restaurants, shopping centers, as well as homework. With the help of it, you can visually expand the space and create a stylish interior in any room. Let's talk about how the liquid floor is poured.

1
The first stage is the preparation of the foundation. You need to clean the surface from dirt, garbage and dust. Bitumen and fat stains are also removed. The preparatory stage includes the processing of seams (their primer and filling with sealant) and cracks on concrete (primer and filling in fiberglass or quartz sand). A concrete brand, which is used for the filling floor, should be no less than M200. The entire surface is desirable to handle the primer, fine-grained quartz sand is added to impart roughness. Works are carried out at room temperature. Where the shelves of the floor with a wall, the damper tape is glued. After preparing the base, it is necessary to wait about a day before applying the main layer. The durability of the liquid sex depends on high-quality training.

2
The second stage is the preparation of the solution. If you are not a professional in this matter, then you need to strictly adhere to the manufacturer's recommendations. On small revolutions, the solution is mixed with a drill with a special mixing nozzle. It is done before receiving a homogeneous state. It is necessary to ensure that bubbles from the air in the solution are not formed (this is possible when working on large revolutions).

3
In residential premises it is recommended to fill polyurethane floors. Due to the use of special technology, the solution spreads, creating a smooth surface. It is better to work together: one person is engaged in the preparation of the solution and floods the floor, and the other - smoothes the surface, eliminating the flaws. Starting work follows from far wall and gradually move to the entrance. No more than 40 minutes are available in order to go through aeration roller. This is done in order to expel the resulting air bubbles. To walk through the painted floor, you need to use special shoes - paint (have spikes that are designed for the surface of such a plan).

4
The last stage is a finishing layer, which is applied 48 hours after the previous one. You can add decorative components or create a 3D effect. Upon completion of all work, temperature seams need to be made. They are done so that the filler floor is not afraid of deformation. Such seams should be 1/3 of the depth above the seams of concrete base. They are ground, then you need to lay a sealing cord and pour with suture sealant.

The bulk gender not only looks beautiful and original, it is also very practical. It has high strength and resistance to any types of loads and physical influences. In addition, the bulk sex is very elastic. It is not difficult to make it, it is enough to know the stages of performance of work, use the recommendations and buy only high-quality materials.

Add a comment

Your e-mail will not be published. Mandatory fields are marked *

close