How to sum up the foundation for the old house

How to sum up the foundation for the old house

Owners of old wooden houses are often faced with the problem of sending the foundation. Disame of doorways, the appearance of cracks, breaks and other deformations are the first signs of the destruction of the supporting structure. To solve this issue, it is necessary to carry out partial strengthening or a complete replacement of the base as soon as possible.

1
The honorable age of the house is not the only reason for the satellite of the foundation. The factors provoking the deformation of the foundation also include:

  • errors in the construction of the house;
  • increased groundwater level and soil;
  • violation of the construction technology of the foundation;
  • large-scale development of the nearby territory;
  • increasing the load on the foundation due to the performance of external superstructures and internal redevelopments.

Foundation6.

2
The replacement of the destroyed foundation takes place in the following order: first of all, the construction itself is most easily facilitated (the overall household equipment is carried out, heavy furniture) and remove the doors, then lift the house to dismantle the remains of the old base and bring the new foundation. The rise of the building is carried out in this way:

  • first, with the help of two hydraulic jacks, they raise the most expensive angle of the house no more than 3-4 cm;
  • in the formed slit, the solid backup is installed - the metal stand is either a wooden bar;
  • similarly, all the corners of the building are raised, while long walls are also strengthened with reliable stops to avoid their sagging under their own weight;
  • gradually, the house is exposed to the required height.

Foundation Raising at home

3
The restoration of the supporting structure is performed by individual segments, so the circumference of the house is conditionally divided into areas with a length of 1.8-2.0 m. After performing the markup, remove the remains of the old foundation in the checkerny order (through one section) and prepare the base - mount the angular support poles and the solid formwork From sawn timber (plywood or boards). Next, on top of the soil alternately fall asleep sand and crushed stone, poured the submersible and carefully seal the formed pillow. At the end of the preparatory work, the reinforcing framework is established and only after that the prepared fence is filled with concrete.

Fondam5.

4
Between the first crown of the structure and the new foundation, there is a small gap for the arrangement of waterproofing. As soon as the concrete fill is "grabbing", throughout the perimeter, the base is lined with a double layer of rubberoid. When the foundation is finally dry, carefully dismantle the formwork and slowly lower the house on the laid place.

An important nuance! The optimal temperature range for concrete works is +5 .. + 30 ° С. In addition, the foundation laying is better to perform in dry windless weather - under the influence of precipitation, the freshly chained design can seriously suffer.

Foundation Hydra

5
Strengthening the old foundation. Minor damage to the old base is eliminated by the following scheme:

  • digging meters around the foundation circumference;
  • eliminate the problem areas on the brick bag;
  • uniformly set anchor bolts around the perimeter of the base;
  • the outer ends of fasteners are connected by knitting wire and welding;
  • mounted formwork from the outside of the trench;
  • at the bottom of the deepening, sand and gravel layer layer;
  • the prepared pillow is compacted and poured with a small amount of concrete solution;
  • in the ditch, the bulk metal grille is installed and poured concrete again.

Foundation Repair2.

6
Creating a new foundation. To strengthen the wooden house, originally erected without reason, perform the installation of a new belt foundation. The construction of the reference design passes according to the following scheme. First of all, on the outside of the construction, the trench is replete with a 1-1.5 bayonet shovel. Then reinforced concrete piles are installed under the lower crowns. The bottom of the trench is lined with a sandy pillow, slightly moisturize it and carefully tamper. Next, the inner formwork is mounted under the log cabin and perform reinforcement with the help of a rod, thick wire or reinforcement rods. After that, the outer formwork is exposed. The prepared belt design is falling asleep with small rubble and poured with a concrete mixture. Waving to dry up the fill, perform the outer finish of the foundation.

Foundation Mini

The timely restoration of the "bone" of the structure is a guarantee of its safe and durable exploitation.