Before the direct installation of the heating unit, boiler room preparation is prepared: a room is equipped with an area of \u200b\u200bmore than 7 m² with a free place to store fuel. The supply-exhaust ventilation of the room should ensure the optimal combustion mode, and the gas output system is good traction. Under the boiler is prepared by a platform from a non-controlled material with dimensions greater than the dimensions of the boiler by 10-20 cm, and from the furnace side - 40 cm and more.
What will be needed for work:- Apparatus welding, electrodes "Troika";
- Bulgarian, metal disk;
- Deploying keys and horn;
- Seaner heat resistant;
- Plumbing winding;
- Level, roulette.
In addition to the above, consumables are purchased according to the designed heating scheme: cranes, coupling, taps and transitions.
The combustion controller is mounted on the regular threaded connection, it is usually made in the form of a lever with a chain attached to the bottom damper. Depending on the configuration, a thermostat or plug is installed.On installation solid fuel boilers No special permission is required, which will mount the unit independently, inviting employees of supervisory authorities after completing work - to test fire safety. The video instructions for installing the boiler are proposed on the example of the Prometheus solid fuel apparatus.