Standards allow connecting on their own and operation of the boiler on a solid type of fuel subject to its acceptance by the Commissioner Commission. The installation process in question will allow you to perform the necessary requirements and make installation at the proper level.
Basic Rules of Montaja
When equipped with boiler room, the requirements of SNiP controlled by the relevant authorities are taken into account:
- The area of \u200b\u200bthe room is 7 m² and more.
- Working ventilation.
- Failed base under the boiler, as well as before furnace.
- The distance from the aggregate to the side walls is at least 70 cm, and in front - more than 120 cm.
- Steel pipes for connecting the device to the heating system.
- GroundingIf there are heating lamps.
Preparation for connection
The initial stage of the installation is to summarize the pipes of the heating circuit to the placement of the solid fuel boiler. For this purpose, the following nodes are mounted on the wall of the boiler room:
- The distribution collector ("comb") - serves to output heated water in the hot supply and heating systems.
- Circulation pumps with connected check valves and locking cranes.
- Tanni and pump control shield.
- Expansion tank with supposed pressure line.
- Output for chimney.
Preparation of all necessary
Installation of the eyeliner implies the manufacture of individual sizes of a plurality of elements using tools:
- Bulgarian;
- Set keys;
- Welding machine;
- Level;
- Roulettes, Marker, Caller.
Also need consumables:
- Two cranes;
- Steel transitions;
- Couplings;
- Thrinking pipe with a valve;
- Plumbing winding;
- Sealant.
A security group consisting of a pressure gauge, valve and the Du-15 crane can be included in the assembly.
Order of installation work
Set the combustion regulator, usually consisting of a rotary lever with a chain holding the damper. Mount the thermostat (threaded connection) and connect wires. Then the hydraulic circuit is proceeded:
- At the output "Furning", located on the rear wall of the boiler, screw the faucet.
- Measure and manufacture the components of the docking of pipes, expansion tank and boiler.
- Collect the scheme by connecting it to the crane by means of a cape nut.
- Safety node is manufactured (or used by the factory option).
- The safety unit itself is crashed into the feed pipe located in the top of the boiler.
- Screw the drain pipe to the safety valve and organize the removal of water in case of reset.
- Plug the pipe supply to the locking crane and connect the circuit to the heating circuit.
- Slip the outlook chimneh, Sewber and smoke pipe are fixed.
Turning on and testing
Open water supply, fill the system and carefully check the presence of leaks. After making sure the quality state of the welded and threaded pairing, proceed to the trial launch of the solid fuel boiler:
- Control the accuracy of the placement of grate, plug.
- Learn and check the coal turning system.
- Fully open the catch of the chimney.
- Put in the hopper of the boiler, fluster paper and sins, fall asleep fuel.
- Fire and waiting for sustainable burning, cover the damper damper.
After a set of temperatures 85 ° C, adjust the combustion control by adjusting the circuit or other damper drive. A detailed description of this operation is contained in the technical documentation from the manufacturer.