How to connect a pumping station

How to connect a pumping station

Life outside the city is characterized by some features that distinguish it from urban, because not every corner of the periphery will meet the communication systems necessary for a comfortable stay. And the presence of a sufficient amount of water is so important to every person of water - extremely necessary. Fortunately, modern technological progress turned the world of construction and repair, and now you can establish a pumping station on each site.

1
First of all, the installation is competent, and its work is full, it is necessary to comply with some rules when installing. Installation can be made on the street or in the house, but the territory must be spacious enough for periodic preventive work. If this room is good noise insulation, low humidity and optimal temperature mode.

2
Optimal options for installing a pumping station - a room inside the house, a basement, a special well and caisson near the well. In the absence of a special place, you can install an aggregate in the bathroom, kitchen or hallway. But this option is the most extreme, since a loud noise will not allow to rest calmly.

3
From the well placed on the street, a high-quality pipeline must be carried out to the equipment. All actions are performed in four stages: digging trenches with a slope towards the unit, the hole device in the foundation at a certain level, direct laying of pipes and linteling the pipeline to the station.

4
On the polypropylene tube, the mesh on the outside. You also need a check valve, without which the pump will not be able to swing water. It is fixed with the help of a coupling with an outdoor thread. When everything is done in a sure way, the end of the pipe can be lowered into the water.

5
To connect, you need to install the device on a brick, concrete or wooden stand and scout legs. You can put a rubber rug under it, which will soften the vibration.

6
Next to the pipe coming from the well to the station, we attach the check valve and the "American" with the coupling. Thus, connect the source and equipment. The second input on the device is designed to connect to the plumbing network. Connection is made like the previous hose.

7
When everything is connected, it is important to make a trial launch. But before you need to fill the entire system with water. To fill the hydroaccumulator, the highway and pump water are started through the bay hole. After opening the valve and running the electricity, the engine starts and the air is removed as the pressure pipe is filling the pressure. When the pressure rises to a certain level, the pump will automatically turn off. Installation completed.

As you have already noticed, installing a pumping station without professional assistance is not just really, but even easy. Just follow the installation instructions.