How to lay fittings

How to lay fittings

The main part of the foundation is its rebel. This is a frame made of metal grids and rods, cooked or twisted with each other. However, that the foundation turns out to be durable and durable, of all types of fittings, it is necessary to pick up the one that will most comply with our work.

1
So, choose the reinforcement. Many choose the largest wire, believing that it will best keep the foundation. But it is not. Give preference fine with notches and edges. For example, for the construction of a single-storey house, the rod must have a diameter of 1-4 cm and a length of about 6 meters.When buying, look at the index. The reinforcement rods with the index s mean that the rental was cooked with welding, and the index to sell the reinforcement, to be sold in a corrosion-resistant aspect arising at a voltage. The absence of one of the indices makes the rods for filling the foundations not suitable. Especially do not think to use for this scrap metal - otherwise the house will collapse!

2
Material and instrumental set, which we need: Wire reinforcement, rod fittings (wire base), cutting machine (Bulgarian), welding, knitting wire, which has a diameter of 1-2 mm, pegs, hammer, roulette.

3
We make the layout of the depth and width of the foundation and fully set the formwork. After the end of the opalic works, we carry out the fitting of the reinforcement belt.

4
Fragments of the reinforcement belt are much more convenient to prepare separately behind the formwork and insert them then inside, connecting into a metal frame belt. From the reinforcement we make the number of details you need, bending them with the letter "P". Detail of the jumper will be installed in the foundation on its width. From this we conclude that the length of the reinforcement belt will be less than the width of the foundation by 95-130 mm. The ending will be vertically, and its length should also not diverge by parameters and have the same dimensions (95-130 mm) below the foundation height. Elements must be calculated, focusing on the length of the foundation. P-shaped parts We will put approximately half a meter from each other at a distance.

5
After the manufacture of P-shaped parts, we put them with the lower jumper on the ground at an approximate half-meter distance one from the other. Previously, the pegs are harvested in the soil next to the P-shaped parts and tie the wire so that they do not fall. The length of the fragments of reinforcement, for the convenience of laying in the formwork, produce three meters long. Two reinforcement rods three meters long laying inside the P-shaped part on the corners and weld with wire into the frame. At the twenty-sentimeter height, the details welded two reinforcement rods, also three-meter length. In such an easy way, we made the lower part of the fragment of the reinforcement belt.

6
The top of the reinforcement frame is done in the same way. We bind to the vertical legs of the P-shaped part of two reinforcement rods. Withstand the twenty-salted distance row from the row. We associate all these are longitudinal ligaments. In such a simple way, we made a fragment of the reinforcement, in which the upper and lower belt is present.

7
We manufacture the number of identical fragments we need to be used for the construction of the foundation. Install them in the middle of the formwork. Each fragment put on the stand - stone or brick. The stand is made in order for the gap between the rod and the bottom of the foundation. To withstand a certain distance from formwork to fittings on the side - seven or eight centimeters. The endings of the rods of fragments standing near, should be overlapped on a twentiethisantimeter length. We associate in pairs of end of fragments of knitting wire.

8
Bending at the right angle required number of rods that serve to connect the segments. For each corner of the foundation there are eight parts. Connect adjacent segments, making connections are the same as we told you before. We overlap the rods by 20 cm and make twists from the wire - for each connection at least 2.

After performing connections at the corners, we consider laying of reinforcement for the foundation of the finished. In the same way, we make all the belt for the remaining walls of the foundation. Upon completion of all work on styling fittings, fill the foundation concrete.