The scene performs the function of protecting the foundation of the structure from the possible accumulation of rainy puddles in the walls, snowy spring floods. It can be done so that it is beneficial to stand out or merged with a common house background. There are different ways to reflect: gravel, rubble, small concrete tiles, a large paving slabs. If the climatic conditions are complex, even insulate the foam.



1
How to make a piece of concrete

  • The width of the future track depends on the width of the serving part of the roof. It is better when it is greater than 20-30 cm, and in general, at least 70 cm.
  • Start with the organization of deepening around the walls of the house. Tear all the vegetation, the walls and the floor, are coated with their means against the growth of plants. Their growth damages the integrity of the layers.
  • It is impossible to plan a horizontal disposal, there must always be the angle in which water flows, and in no case was found to accumulate moisture. Delive to a shovel at least 20 cm.
  • Install formwork from wooden boards (2 cm).
  • On the soil, we roll a layer of rubble 5 cm thick distributions.
  • Belt from fittings for perimeter It gives flexibility, prevents cracks in the surface of concrete, its destruction, spoiled appearance. Attach the belt to the wall driving holes in it and deepening there an additional fittings, which is then tied to the grid. In the future, concrete will fix the junction of the rod and walls. The grid is doubled.
  • Beton is poured using a pre-installed formwork, align the surface.
  • Do not forget about the chute for the drain. Take a plastic bottle of 2 l and scroll in the right place.
  • Strengthen relonished Surface sprinkled with dry cement.
  • Natural destruction processes affect construction work on home improvement. If the work is carried out in sunny weather, the concrete is covered with a moistened cloth, in order to protect against cracks. In rainy weather, such precautions are not required.
  • Formwork prepares removable. He supports outside bricks or the same boards.



2
How to make a slice of rubble

  • The sequence of layers is almost the same, different materials only, but functions same.
  • Clay fatty places closer to Earth - 15 cm.
  • Waterproofing - rubberoid, PVC, other.
  • Sand cleaned from garbage - 15 cm.
  • Geotextile.
  • Crushed stone, which is of different fractions, ranging from 5 mm to 70 mm. Large size will interfere with walking, very small pebbles up to 5 mm go to the powder.
  • At the stage of styling waterproofing, sand, geotextile The foundation is put on the clamping rail, thus fixing the materials in the wall.

3
How to insulate the breakfast with insulation

  • The material used for insulation should have these characteristics: waterproofing, safety for life, antifungal properties, damping during fire. Roughly speaking, it turns out a puff pastry consisting of alternate laying of materials.
  • The first layer, which is closest to Earth - geotextile. It forms the design, stacked between the soil and the next bulk layer.
  • Next comes 15 cm of bulk sand. Take a river or career option.
  • Heater - foam, ceramzit, etc.
  • Polyvinyl chloride.
  • The sand layer is duplicated with a thickness of 15 cm, thus it reduces the likelihood of failures, compacted.
  • Geotextile.
  • Small Caliber pebbles.

3
What itchies the right breasts - add-ons

  • As a result, the scene performs a decorative, protective and practical function for a person.
  • Attractive species create such stones: granite, marble, quartzite, etc. True, their cost is not low, but the result exceeds all expectations.
  • The tile is laid carefully hanged on top of a rubber hammer. Be sure to do not forget to enjoy the level for adhering to height. After laying the tiles, sweep the floor and wet it from the hose by choosing spraying mode on the nozzle. Leave for a week, to safely protect so that no one has broken the uniform drawing and grasp concrete with tiles.


The scene is well suited for heat insulation, minimalization Merchants of soil B. district foundation. Repair work can be made with your own hands or to attach the brigade of the masters. Before proceeding, take into account the characteristics of the territory, the material side, the climate, the correct installation of the drainage, on which the increase in the service life of the breakfast, its rigidity or softness depends.