How to strip the house siding

How to strip the house siding

Conducting at home by siding is beginning with the calculation of the desired number of panels, as well as component elements. To facilitate the task, the walls are measured, a diagram is drawn, showing the location and dimension of door and window outputs. Based on these parameters, you can find out how much the material it will be necessary - calculate yourself or this will make the seller of vinyl panels.

1
When installing, you will need: roulette, level, beep, screwdriver, staircase or scaffolding (depends on the height of the house). To cut panels, you can apply:

  • Knife cutter;
  • Hacksaw with fine tooth;
  • Metal scissors;
  • Bulgarian;
  • Lobzik electric.

All the protruding elements and the detached old coating are removed from the walls, the wooden surfaces are coated with an antiseptic.

2
Mounted doomle from bars 50x50 mm or a galvanized profile is used. To do this, starting from the corners, vertical lines are placed in a step of 40-50 cm (if the insulation does not apply). Guides are secured after 80 cm, if necessary, under the wooden bars, linings are lowered, and profiles are equal to changes in the height of the bracket. Additional guides are installed around the doors, windows and where it is planned to hang out, for example, street lights.

3
Siding is left on the street, for 2-3 hours. At a distance of 8 cm on the base of the wall, a strictly horizontal line is made - this can be done with the help of the corners of the nails and stretched between them with a rope, the position of which is checked by the level. An outer angle is applied in place and its width is marked, also repeated for all corners of the house. Rates from the label 6 mm, the starting strip is applied to the top of the horizontal line and is screwed by self-pressing with a press washer. When fixing all elements, the rules are followed:

  • Self-tapping screws are tightened in the center of the elongated hole;
  • There is no less than 1 mm between the press washer and plastic;
  • In the summer, a side gap of 5-6 mm is performed between the panels, and in the winter - 9-10 mm.

4
Below the roof cornice on the width of Sofita plus 6 mm are installed angular profiles, screws are screwed up every 30 cm. Next of the J-profile are manufactured and mounted platbands for window openings. Getting started to install panels: the first panel is snapped at the bottom in the starting strip, it is fixed on the mounting edge by screws. The remaining panels are attached similarly if the walls are longer than 3.66 m, the H-profile is used for docking.

5
At the top of the walls, the finish plank is first installed, then the last panel is snapped into it. The docking of the finish profiles is performed with a brine with cutting on a 30 mm mounting edge. If the house has the house, the latter is closed by special profiles - sofits and a cornice board.

Installation of vinyl siding can be made all year round, but it should be remembered that at low temperatures, the material becomes fragile, so the cutting of panels in the winter is carried out with marginal caution.