Installing countertops, perhaps, the simplest thing that the owner can make the home independently. Final stage kitchen The settings occurs in several stages.

1
  Front The final stage of the kitchen equipment is making sure that all previously completed works are finished, wires and hoses are connected, the working area is clean. Inspect the worktop, there are no visible defects and distortions. Perform a preliminary fitting. In case of inconsistencies, the previously specified parameters, you can directly refer to the seller.

2
  If The product is made of Chipboard, Then it is necessary to process the unprotected edges of the product to avoid deformation. The perfect option is sealant. Before the process, degreased and wipe the dry surface.

3
Level all the coals and edges, check the horizontal lines. If you are not serious about this stage, in a short time asymmetric installation will make yourself felt. Cracks and seed as a consequence of negligent installation. Perform markup to the sink. Sections are treated with varnish or sealant.

06stole-c-edging

4
  If Kitchen furniture is decorated in a M-shaped form, then you need to put a tabletop onpollen furniture atmosphere, leave a little opening Near the rear and side wall and two parts tightly connect. It is not desirable to make a joint on the angular part.

5
Fix the distance of the alleged area from the edge to the edge of the floor bedside table. Do not forget to take into account the gap 2 cm for the overhead panel. Mark a simple pencil on the front or back side of the panel, depending on the method of cutting. If as a boat tool You will use the hacksaw, then you need to outline the lines from the front side. Working with a sawmill is performed on the markup on the involving side.

6
Performing cutting with a manual saw, select a small-scale cutting plate. Prealt the scheduled line with a ribbon to avoid chipping and loose panels. If you have a disk tool, then turn the table top and use the verification ruler. The resulting sections must be cleaned with a file.

7
  If The outdoor cabinet was dismantled or planned a new installation, then immediately apply marking on the basis of the measurements. After performing marking under the closet and the sink, you can safely fix the processed panel. Place the product, crush the gaps, mark the place of attachment, drill holes and secure the worktop with special fittings.

Before installing the table top it is necessary to polish, degrease and apply a water-repellent mixture in sections.

Comments leave a comment
Anna 20/07/2019 at 11:55.

We have a non-standard kitchen, plus my ideas have my ideas and with whom it will realize this in life, I don't know what company to do me this kitchen, I don't know ...

To answer
Alla 07/22/2019 at 11:31

Anna, go to the furniture factories of Beaver, see the catalog and prices. If you like it, contact them, they make any non-standard sizes. We also do not have a kitchen and we really liked how they did everything. A consultant can come to the house and tell everything in detail and give delivel tips. Satisfied with one word in the quality of the kitchen and their work.

To answer

Add a comment

Your e-mail will not be published. Mandatory fields are marked *

close