How to make tracks in the country

How to make tracks in the country

Tracks in the country and in the garden are not only undoubted benefits and convenience, but also fresh solutions in landscape design. If, of course, you have enough fantasies and skills with fiction to approach such a seemingly prose element like a track.

1
The first thing you need to do before laying tracks is to distinguish your site by sectors and draw a plan. Decide where you have a garden, where the garden is where the recreation area and place for games. After laying tracks, change something will be more difficult. Next, find out what kind of soil in your garden, at what depth are groundwater, because this will directly depend on the choice of material for the tracks and pillows under them. Consider the climate in which you live if you often have rains and fogs, then put the tile or smooth paving slabs on the tracks - the top of inside.

Rain

2
The second stage should choose the material from which you will do the track. The most expensive and prestigious is, of course, the paving slabs, however, in his pocket he is not all. Another cheap option is the paths of wood, natural or artificial. Such tracks usually lay out either from the boards or scrabble, colorful, but not so practical. The paths from the natural stone also enjoy great demand, even though the price of them is great, besides, the laid out of such a track is very laborious. The most durable and durable tracks are filled with concrete, or from concrete slabs.

3
Before starting to lay tracks, it is necessary to carry out preparatory work. For a start, proceed shallow trenches in the width of future tracks, and better with a margin on the border. Do not spare widths, you should be convenient to walk along the paths just like that, things or buckets with water, it was possible to carry a trolley or a lawn mower, the child could drive on a bike. In a word, think about your own convenience, and not about lost centimeters.

4
The depth of the trench depends on the material from which you will make tracks. Pepping that the surface of the track must be slightly above the ground level. Each of the ends of the trench stick over the pin, take the rope between them - on these guidelines you will lay track. On the floor of the trench, unlock the waterproofing material - the film (or its analog). Then pour the trench sand. The topmost layer of a mixture of cement and sand (not cement mortar!) - just a couple of centimeters. This is a pillow for paving slabs. For wooden flooring, you can make a pillow from finely rubble, for wooden chumbachkov - sandy.

Pebbles

5
The pavement tile should be laid in a checker, even in terms of level and every tile climbing with the Cyan. After laying, all the cracks must be thoroughly filled with sand. After a few days of active use of the track, span it with water so that the cement mixture is grabbed - after drying the track will be ready. The tracks from concrete slabs are laid in the same way. The natural stone also puts on a pillow of sand and cement.

6
Wooden boards are stacked on a pillow of a small rubble, and if the soil is clay, then you can immediately on the ground and get into full for reliability. If you decide to make a walkway from fucking, then sawing the log on the same circles in the height. Trench float the sand - by 5-7 cm, thoroughly confuse it and start laying a fucking blob. Upon completion of laying all the cavities, fall asleep sand.

7
If you decide to pour a solid concrete track, then just dug the trench, set the beacons, mounted formwork. Down Pull the sand layer with gravel - 5-10 cm and tightly tamper several days. After that, cook concrete, a mixture of cement and sand, and pour the tracks, moving them. 5 days after the complete drying of the cement, it is possible to remove the formwork and make borders.

Beautiful and comfortable tracks from the correctly selected material will not only provide access to your beds in any weather, but will decorate your site.