How to lay a blocking

How to lay a blocking

The tracks lined with a paving - beautiful, durable, environmentally friendly. They will easily fit into the landscape design of the plot.

Tools:

  1. Traaming;
  2. Narrow spatula;
  3. Level;
  4. Rubber hammer;
  5. Rake;
  6. Cord of the jet;
  7. Pegs.

Materials:

  • Pavement;
  • Geotextile;
  • Sand;
  • Crushed stone or gravel;
  • Cement-sandy solution.

Bruster3.

1
Place where the tracks on the site, laid out the pattern. Follow the territory on which the tile will be laid. In the perimeter, put pegs and pull the cord between them.

Blocks2.

2
Determine the direction of the slope. It is focused on the house / buildings to drainage systems. The bias should be from 2.5 to 4 cm per 1 m length. The top layer of the soil is removed on the depth required to accommodate the tiles, layers of sand and gravel.

Earth recess3

3
A geotextile is stacked at the base, the crushed stone layer is poured on it. 20 cm. The rake is formed a slope, the layer is compacted by a traam. The next layer, a thickness of 10 -14 cm - sand. It is watering with water and trambed.

Layers

4
Installed and fixed by cement-sandy currency.

5
Laying tiles starts from the bottom point up. Or from the main elements of the landscape. Tiles fit into dense. Each laid out row is sealing with a hammer. On the turns and curved areas of the track between the paving, it is allowed to leave the gap.

Laying 2.

6
Upon completion of the work on the track, the small sand is labeled, and then it is washed under weak water pressure.

Finishing stage

7
To lay paversing on a large area, the composition and thickness of the layers are changing. Required sequence: geotextile, crushed stone 20 cm, sand 15 cm, dry cement-sand mixture 5 cm, paving.

Area

The coating can be laid in various patterns, or even draw pictures on Earth. Find creatively for design, and you will admire more than 8 years.