Paving slabs are becoming increasingly popular among dachens and residents of country houses. This is a durable and practical material for the pavement of yards, tracks and parking spaces. In addition, the tile laid out of the pattern is not devoid of external attractiveness and gives the site well-kept and respectable appearance.
1
Determine the place you are going to face a blocking. Put the beacon around the perimeter, pull the thread between them, output all sizes. Calculate the number of pavers that you need. If you are going to lay out the pattern, then it is best to draw an exemplary drawing - laying plan. Remove the soil at least 15 centimeters deep into. Carefully remove the garbage, all the roots of the plants, if any.
2
Ideally, if the trench has a small slope, so water will not be stood in it. If the ground on your plot is clay, it is necessary to make drains for water and drainage in the lowest part of the trench. Thick log wrestle the soil inside the trench. The bottom can be sealing the type of agryl or agrotect type - this will allow you to avoid deformation of a crucible track in the future.
3
Push out the trench of the rubble fraction of 10-20 mm, a layer of 10-20 cm high. Then whip the crushed stone with water and thoroughly confuse the same log. On the ramble crushed stone you need to pour sand - it is better to use a little wet. Lay a layer 5 cm align with rail and confuse again. On the sand layer, it is necessary to put the reinforcement grid (however, it is possible to do without it - this element is optional) and pour a dry cement mixture - layer 3-4 cm. Also, instead of a cement mixture, tile glue can be used - it is even more reliable, but also more expensive. If you make a track, then at this stage you need to put a border.
4
When the preparatory work is completed, you can proceed directly to the lays down of paving slabs. This should be accurately, thoroughly aligning each tile in terms of level and height, as well as clutching and tamping each tile rubber or wooden inquiry. The layout of the plates can be done traditionally - in a checker, ladder, christmas tree or squares. You can show fantasy and ingenuity. It looks good for a combination of several colors.
5
After you posted the entire paving, lean over a dry cement mixture and carefully distribute it along the slots between the tiles. Remove the surplus - the tile should be completely clean. Well pipe with water to moisten all the corners of the track. After a couple of days, when the cement mixture "gets up", your track or a paved yard will be completely prepared and will withstand you, and even your car.
The sidewalk itself is very durable and durable, so the service life depends in many respects from the correct laying. If you comply with all the rules, it will last you for a very long time.