In Russia, winter is cold, and to preserve heat, the bath is always divided by half - in the pre-tribades undress, in the steam room are clean. The pre-tribader also delays the cold air in front of the parillery and creates comfort for visitors, while maintaining heat.
1
The insulation for the pre-banker each chooses individually. Thermal insulators from inorganic components (glass wool, mineral wool) are considered ideal, or foam-related plastic (foam, poroplast). Organic produce from peat, reeds, often installed with polystyrene foam and other artificial materials.
2
Warf the pre-banker since the start of construction. Do not build a large pre-banker, 25 square meters. m enough with your head. Doors size - 185 × 85 cm, should be opened inside. The presence of the window does not reduce thermal characteristics, but special requirements are presented to it: choose without jumpers, place no lower than 1.5 m from the floor, the cracks thoroughly close. Plastic windows are not welcome, it is better to put wooden, not opening, with double double-glazed windows.
3
For the floor, buy waterproof materials. Betters are considered billets from fir, larch. Capper bars will fasten the cranial bars to the bearing horizontal beams. Place a vapor barrier material in the form of pergamine, on top - heat insulator (clay) and a layer of waterproofing. All cover the boards.
4
For ceiling insulation, the support beams are laying 1 meter. Lagges are cut by boards that divide the surface to the section. On top view of boards, steampoints and plates of the insulation in one or two layers, the volume depends on the size of the bar. Everything falls asleep by clay with a thickness of five centimeters, which should divert water from the insulation, and is covered with a vapor insulator.
5
The insulation for the walls placed behind the trim from the street. A good thermal insulator is considered to be plates from a cantham thickness of 15 cm. The reed should be treated with a three-percent solution of iron vitriol.
6
For insulation, a long-made pre-banker is used polyurethane foam. It does not require a pre-manufactured framework, the vaporizolation material is also not needed. Polyurethane foam sticks to any material, reliably rests on the ceiling. After frozen, the coating without seams is obtained. Walls can be wrapped on the walls.
7
For insulation of the room, it is recommended to modify the baths of the bath. On the edges of the box, a wooden frame of a depth of 2.5 cm is nailed. The mineral wool is stacked in the frame cavity. From above, everything is closed by plywood, which is nailed with cloves.
Errors with insulation lead not only to the rapid cooling of the bath. In the pre-banker will be wet all the time, wooden structures are spoiled without ventilation, an unpleasant smell appears.