In a private house, there is always something to do what is such an endless series of a variety of things that never end. Today we will talk about outdoor coverage, because it is very important which material will lie on the floor and what quality it is. One of the highest quality materials in this case is a tree, and he is also the most durable. Order masters for finishing and repairing private houses - the pleasure is not cheap, so let's deal with more detail in how to make the floor of the tree in a private house.
Treatment of wood
Today, multilateral materials are increasingly popular. And the tree is included in this list., Moreover, by occupying one of the leading positions in it. The thing is that. What exactly the tree has the greatest amount of advantages:
- Durability
- Practicality
- Availability
- High quality level
- Ecologicaly clean
- Universality (use it for finishing the whole house, any part of it)
It is clear that it is not from elementary to independently put the wooden floor in the house, but there is nothing over complex in this process if your hands are growing "from the right place." It should be understood that in the end you should get a durable and durable floor that will not need to be dismantled after a couple of years. In order for the result to please you and all living in this house, it is necessary to study the technology of the floor and all the nuances of the process under consideration.
Montage rules
It is clear that most of the requirements are presented precisely to the flooring, because the greatest and regular load is underway. It is this factor that leads to the fact that it is necessary to comply with a number of requirements and rules:
- Humidity in the room should not be more than 11%. This is a prerequisite in the event that you do not want wood to be deformed over time.
- The acquired material in this case the tree must be viewed. Moreover, carefully and on all sides - no deformations. Defects in the form of cracks and chips should not be, it is you responsible for the quality of the purchased goods.
- Remember, wood must pass antiseptic processing, otherwise, there will be no durable material.
- Do not save on the raw material for the floor, because the quality level is the main criterion in the durability and practicality of the floor. Preference is preferred by solid coniferous rocks.
- The ideal time for mounting the floor of the tree is the easiest of the heating season.
Floor arrangement
For the process under consideration, you can use various materials, the most common and often acquired are:
- Chipboard
- Folding board
- Unedged board
- Board of grilled timber
Among other things, the selected material will directly depend on what type of gender you get to organize. If it is a draft floor covering, the chipboard and the edged board are the ideal option for the purposes under consideration. For the design of the finishing floor, the boss is a glue and folded board.
Before starting to raise the floor, you need to do preparatory work:
- We estimate the state of the soil. In some cases, the board can even be laid on the ground, but do not forget that before this it is necessary to put waterproofing there. Some places require sand and rubble laying, and only after that you can put the board.
- Today, a specific instruction on floor laying in a different kind of premises is not yet spelled out, therefore, it is possible to use a universal option that is suitable for any room, with any humidity and other features is the laying of wooden overlap on the concrete or sandstone-cement screed.
Laying a wooden floor
The laying process is long enough, this is not one day matter, but the description of these processes will be understandable to you:
- For a start, the soil must be very good to ravage.
- After the proceeded process, the sand should be poured into the rammed sand (in this case, the minimum layer of 25 mm).
- The next layer is a waterproofing material. As such, the runneroid or dense cellophane can be.
- It is not necessary to think that now it's time to lay the floor, no, because first the waterproofing is installed and beams. It is necessary to do this at an equal distance, which means that it will be necessary to carry out some calculations before the process. The ideal option is if the length of the lag will be equal to the length of the room where the floors will be laid.
A double wooden floor device is a great option that will serve for you long and at the same time, no problems with its operation will arise (the single version is not durable). In this case, the sequence of processes is as follows:
- Installation of Lag, between them there must be plywood of moisture-proof type
- Next layer - high-quality insulation
- black flooring
- last Upper Layer - Laying Floor
If you are looking for the optimal option, then a massive board is that. What do you need, because it has a lot of advantages:
- Appearance - Gorgeous
- Practicality - at a high level
- Durability guaranteed
- Possible load - maximum
To lay the floors is quite simple, if you know the structure of this process and all its nuances. The main thing is to follow the detailed instructions and use quality materials.