The laminate has heard a fairly aesthetic coating that successfully imitates the wooden floor. It is inherent in a democratic price, and it is easily stacked, as a high-quality lock system is provided. However, besides such tangible advantages, the operation of the laminate is associated with some inconveniences. It must be mounted on a qualitative basis, as it will begin to behave unpredictably - to creak, troce and hurt. And this is no longer a joke, it annoys! What to do in this case?
Uneven base. In the case of a poorly prepared surface, the laminated coating will be creaked only in certain areas where the holes occurred. It is over them that the laminate saves and begged when a person comes to him. At the same time, sounds are published. Therefore, it is always worth paying attention to the alignment of the draft floor under the laying of the coating.Solution:
- If all this trouble happened, then try to correct the situation: disassemble the laminate until you find a problem space, squeeze the hole with a solution or launch the cardboard sheets, then the coating is placed in place.
- With stable sounds from all sides, nothing remains to you, except to fully disassemble the laminate, numbered its dice to simplify the subsequent assembly. Then you have to remake the base, the bulk floor is best suited for this.
What to do: you need to disassemble the floor, get a thick substrate and replace the base to thin, aligning the base.
To solve the problem, remove the plinths, then reduce the extreme coating boards to the gap formed. After that, the plinths put back. Delta of humidity level. Laminate is an outdoor coating that reacts sharply to moisture drops. It creates when it is raised, besides all the floor surface. When the humidity is normalized, the sounds disappear. As a rule, this inconvenience disappears in itself. And over time, the laminate adapts to the installed microclimate. But if the creak does not pass, you will have to completely remove the coating, search for irregularities, to lay this floor again or shut down a new one.
How to proceed. The sand is considered a fairly serious problem when you have to fully disassemble the laminated coating (do not forget to numbered the dice). After you need to take the screed, cover it with primer and put a new substrate. In case of doubt, place a polyethylene film on the tie for the substrate.
Do not forget about the whimsicalness of such a simple laminate look! The reasons for the symbol considered above should be taken into account even at the stage of laying a laminated sex in order to prevent them further. Do not forget that before the workflow, the material must "acclimatize" in a new place - for 3 days. This moment can also trigger the screens, so do not drop from accounts and it.