How to put air conditioning

How to put air conditioning

Installing the air conditioner is a difficult task, not everyone can perform it on its own. Having studied this instruction, it will be possible to make a decision on independent installation of the device or simply get acquainted with the rules of high-quality installation of the split system. The latter will not let yourself be deceived when contacting specialists.

1
To work, it will be necessary, in addition to familiar tools, also specific equipment that is better to take on rental. Here is a list of necessary:

  • The perforator is quite powerful if the wall is concrete or brick;
  • Set for rolling tubes included with pipe cutting and rig;
  • Vacuum pump for air and moisture removal;
  • Tester and pressure gauge.

2
Determine with the location of the indoor unit. There are places where it is not allowed to install:

  • Behind shirms, curtains and curtains;
  • Over any sources of heat, such as radiators, fireplaces;
  • In rooms with microwave and induction ovens;
  • In places where sun rays will fall on the device.

3
Choose a place for the outdoor unit, preferably from the eastern or northern side. When installing "face" to the south, a protective visor is performed. The block is placed on the prepared brackets. A hole for pipelines will be drilled, the mounting area for the indoor unit is attached indoors.

4
Wiring is carried out, even for a small system, a dedicated line is needed with its automatt in the power shield. If the house is strong old, additional problems may appear, up to the replacement of the entire wiring.

5
We measure the length of the communications and with a reserve of 20-30 cm cut the tube from copper. The ends of the tubes need to be rolled and connect them to the internal device. Dress up heat protection, all leaving ends twisted into the bundle and is encouraged to the street. At the same time, the block on the mounting plate is suspended.

6
We remove the extra wires and tubes, rolling the ends and connect the pipelines and power supply to the outer block, we derive the drainage tube. Then, with the help of a vacuum pump, we pump out air, for which the pump runs 15-20 minutes, turns off, and if 15 minutes the pressure does not fall - the system is sealed. Now unscrew the cranes and run Freon. We connect the power and check the installation in all modes of operation.

This description is rather the nature of the recommendation, there are many problems when installing such complex equipment, there are already experience and specific skills to overcome them. For a complete understanding of the issue, we propose to explore the video on the installation lesson for air conditioning.

Add a comment

Your e-mail will not be published. Mandatory fields are marked *

close