How to calculate building volume

How to calculate building volume

It is necessary to determine the building volume of the building in order to calculate which cost the project will be issued. In the Vedomost to calculate the scale of operation will be entered by these parameters. When calculating the amount of work, there are conditioned rules that need to be followed.

1
When calculating the construction volume of the ground-based part, along with the attic overlap, the area of \u200b\u200bthe horizontal section is multiplied (located above the base) with a building height (the measurement passes from the floor level of the first floor to the top point of the attic insulation). In the absence of an attic ceiling, a vertical section will be multiplied by the length of the building (perpendicular direction passing at the level of the first floor to the cross sectional area).

Private home reconstruction - from-studio-AI-01

 

2
Light lights that appear as an outer image of the roofs, also belong to the volume of the building. The parameters of the veranda, tambourists, erkers and other areas of the building, which will increase the useful area, also need to be included in the construction volume of the construction. This will not include only porticists, balconies and travel.

3
Technical floors will also refer to a total volume. Measuring a horizontal cross section, multiplied with the height of the attic shine of the attic, you calculate the attitudes of the attic floor. If the bends and irregularities often come across the surface of the walls, then calculate the average.

4
Determine the volume of the semi-oiled and basements, moving the combined area of \u200b\u200bthe basement horizontally at the level of the first floor to height (start the measurement from the level of pure floor of the basement to the floor of the upper floor). The construction volume of basements and semi-oops will refer to the above-ground part of the construction.

4 basement

 

5
When measuring the walls on the outerbeard, do not forget to take into account the thickness of layers of cladding and plaster.

Collecting data and constitute a statement about the volume of construction work, guided only by technical directories and documents. Counting Do on reliable schemes that helps you objectively assess the situation with the settlement system and the order of the sequence of production.