How to get a building permit

How to get a building permit

Construction permit is a document confirming the compliance of the project documentation plan or project planning project, in the event of a linear facility, the plan of the territory of the territory. The presence of this paper provides the developer the right to carry out construction and reconstruction work at the facility. Without building permission, it is impossible to get a target loan in the bank and connect to utility networks.

1
The issuance of building permit is engaged:

  • Local governments of the district or municipality, in which land plot is located.
  • Territorial bodies of the Ministry of Natural Resources and Ecology of the Russian Federation - if in the construction process will be carried out using subsoil.

2
The first step is to prepare a set of documents. You will need:

  • a document confirming the rights to use the land plot;
  • site plan;
  • passport or other document confirming the identity of the applicant;
  • if the design is carried out by the representative - a notarized attorney;
  • project documentation (information about engineering networks, construction plan, explanatory note);
  • if the construction object is a separate worthless private house not higher than three floors, intended to accommodate one family, the project documentation is not needed.

3
Step The second - appeal to the authorities to obtain permission:

  • You need to write a statement to the head of the municipality.
  • Together with a set of documents, the application is transferred to the body engaged in issuing a construction permit.
  • For ten days, the documents and reconciliation of project documentation with the site plan are checked.
  • After the expiration of the specified period, the authority issues permission or refuses to the applicant.
  • Failure can be appealed in court.
  • The document is issued for free, payment of state duty is not required.
  • The validity of the permit to ILS (individual housing construction) is 10 years.
  • For ten days from the date of receipt of the resolution, the developer must provide engineering documentation (floors, object area, communication).
  • When selling a land plot or other change of the owner (transition by inheritance, donation) the right to the construction and validity of the permission is preserved.
  • The authorities have the right to refuse to issue permits only subject to the provision of an incomplete set of documents or providing unreliable information.

On our site you can download the form and a sample of filling out the application:

4
Requirements for the IZhS object:

  • Residential rooms - no less than one. At the same time, the size of the living room should be from 12 square meters, bedrooms - from 8.
  • The presence of a kitchen with a size of 6 square meters, in the presence of a heating boiler - from 8.
  • Bathroom width and toilet - from 1.5 and from 0.8 meters, respectively. The bathroom should be separate.
  • The minimum width of the corridors is 0.85 meters.
  • The height of the ceilings is at least 2.7 meters.
  • Distance from the street line is a minimum of 5 meters.
  • The distance to the border of the neighboring area is at least 3 meters.

5
Cases when permission for ILS is not required:

  • During the construction of the garage. The exception is cases of allocating the land plot for commercial or business activities.
  • If the land plot was purchased in the country or gardening cooperative.
  • When erecting objects not capital construction (pavilions, kiosks).
  • During the construction of auxiliary objects.

Collection of documents and obtaining a construction permit - a rather laborious process. However, without this document, the commissioning of the built house is not possible. The process of obtaining permission is governed by urban planning and land codes.