How to put a tile in the bathroom

How to put a tile in the bathroom

When choosing materials for finishing the bathroom, the choice most often drops to ceramic tiles. Compliance with the technologies and the procedure for carrying out work when cladding walls and gender allows for a durable coating.

1
Laying tiles in the bathroom begins with the preparation of walls and dismantling washbasin and mixers. The bathroom is dismantled only if it is replaced. If the bathroom is joint and you plan to put the tile on the floor - the toilet too will have to be removed. Do not hurry to arrange ruin until you buy all the materials. Many shops supply tile on orders, to wait for delivery takes up to two weeks.

Tile

2
Make accurate measurements and draw the plan for each wall. The sales assistant will help you calculate the required amount of tiles. With an independent count, consider the size of the tile, the height of the bathroom, the location of the door. Do not focus only on the wall area and floor - part of the material will go on trimming. When laying the tile diagonally add 20% to the floor area on trimming. For the floor, choose a tile with anti-slip coating.

Tile in the bathroom

3
Procedure for conducting work:

  • Dismantling plumbing;
  • Removal of old coatings;
  • Alignment of walls plastering mixture;
  • Electrical installation work - cable laying and regabulating installation;
  • Waterproofing device;
  • Floor alignment;
  • Wall covering;
  • Laying tiles on the floor;
  • Shutdown of seams;
  • Installation of plumbing.

4
Use the perforator to dismantle the old tile. The whits are considered to the spatula. On the walls painted with enamel or oil paint, make notches with an ax. If the paint holds well, it is enough to treat the painted surface with concrete-contact. After removing old coatings, carefully inspect the walls. When the fungus or mold is detected, dry the room and process it antiggribovka primer.

Dismantling

5
Set the beacons and align the walls with a plaster mixture. Let me dry within 2-3 days. Dried time depends on the thickness of the plaster layer. Route the electrical cable and install the submersors. Usually, the bathroom requires a socket for a washing machine and above the washbasin - to illuminate and connect the electric shaver or a hair dryer.

Socket1

6
Apply primer to twisted walls. Using a laser or water level, mark the walls. Installation of tiles start from the bathroom or fix the guide on the markup. Do not post more than two rows of tiles per day. Non-deep glue in the lower rows will not power the load, and the tile will go away from the wall. For tile trim, use the electric stovetur with a diamond circle. Holes for pipes are cut off by a special nozzle on a drill.

7
The waterproofing of the floor helps not only avoid flooding neighbors, but also protects the slab from the exposure of moisture. For waterproofing, use the finished sealant or special dry mixtures. The lower part of the wall is processed by 10-15 cm. After leveling the surface of the cement mortar or a mixture for a bulk floor, you can start laying tiles on the floor.

Laying tiles on the floor

Having an idea of \u200b\u200bthe rules for laying tiles in the bathroom, you can independently make repairs or monitor the work of the master.

Add a comment

Your e-mail will not be published. Mandatory fields are marked *

close