How to make a warm water floor

How to make a warm water floor

Properly made warm floor will serve you for many years, effectively warming dwelling in the cold season. The main complexity of its manufacture is that it is problematic to calculate with the accuracy of the required amount of material and laying parameters. If you doubt your abilities - contact a special office to develop a project.

1
Before you proceed directly to laying a warm floor, you should know what to do this in three ways:

  1. The warm floor is poured with a concrete tie over the pipes.
  2. The warm floor is not filled with a screed, and the pipes are originally covered with an aluminum sheet, then a special noise insulating gasket, for example, from cardboard, and then laminate, parquet or ceramic tiles are stacked.
  3. The design is placed on the old wooden floor and over is covered with new boards.

Since the most visual and versatile is the first option, and consider it in detail.

2
Select a location where the collector will be set. In order not to make a mistake in the installation process, the box can be put in advance. The room itself is divided into 40 cm2 sectors for the convenience of laying and taking into account pipe expansion.

3
So that the heat rifles up with the smallest loss, heat insulation the floor with the help of foam, polystyrene foam or foam. On the perimeter of the entire premises, along the walls, lay out the damper ribbon. Thanks to her, the expansion in the concrete screed will not lead to the ruptures of the screed itself during operation.

4
Tension over the entire area of \u200b\u200bthe reinforcement grid. She will need to fasten the pipes themselves.

5
Now you can safely begin styling. Usually, the pipes are distributed by a snake or spiral with a displaced center. Secure the pipes using clamps to the reinforcement grid. Fastening step - 1 meter. Do not tighten the clamps too much so that they do not interfere with the normal expansion of pipes during heating. Pipe laying itself - from 10 to 40 cm, it is recommended to retreat from the wall to a distance of at least 8 cm. In those places where the pipe will take place near the deformation seam, prudently put on it a corrugated pipe.

6
Connect the pipes directly to the feed collector. You take the end of the pipe of the first circuit and fasten to the collector, then make similar manipulations with pipes from other contours. The last end of the pipe of the last circuit is attached to the return collector. Focusing that the average length of one heat-mall circuit is from 50 m. After completing the work, check the installation correctly until the bay of the screed. It is better to do this under the supervision of an experienced specialist.

7
If the design turned out without defects, you can move directly to the flooding of the floor screed. This uses special mixtures that are easy to find on the market.

Warm water floor make it yourself not so difficult, as it seems at first glance. Some are in vain experiencing that he "steals" a large space room. In fact, the height of the warm water floor will be only 7 cm. But your legs will always feel comfortable.