Wiring and connection of electricity are important moments when equipping housing. Residential condition is determined not only by the presence of amenities and vital functions, but the technological stage of their execution. Incorrect wiring and high load on the network threatens fire.
1
Pre-make a plan and count the highest possible load. Remember, you can not throw the supply of electricians for one branch, there must be at least two of them, and better three or even four, if you look into the future. Innovative technologies stretch up, and every year the shelves of stores are broken from all sorts of equipment and gadgets.
2
You You can perform wiring yourself if competent in this area and have practical experience. If your house is not connected To the general electricity, then first of all it is necessary to obtain technical data that provide competent structures in the form of permission to wiring electricity.
3
To Get permission to access the power grid, you need to collect a considerable package of documents, after which you get THATwhere information is available for electrifying your home. Now you make a project of electricity wiring or apply to a profile contractor. Many organizations are engaged in similar developments, but The cost of services does not always justify the expectation. After approval of the project, proceed to install.
4
The supply of electricity can be performed in two variations - air and underground way. The first option is significantly cheaper than the second. In the underground section, you must perform a protective installation. Before starting the installation work, buy all the materials. Do not buy cheap Cable, remember, safety primarily.
5
Buy the self-supporting insulated wire marking wire 4 (SIP-4), where conductive lived - it is steel and aluminum. This cable is not afraid of the gusts of wind and icing. Depending on the intended consumption, select the wire section 16 –25 square meters. mm. The wire is set into the house through the metal pipe and connect to counter.After that, you can install the voltage stabilizer.
6
If You decide to bring electricity under earth, then the trouble will add. Buy a cable from improved thin livers. Drop the trench minimum tr vglube, then pour with sand cover at least 20 cm. Put the cable in the sand pillow gofrotrube And fall off 20 cm sand. Make sure that the wire is not strongly stretched, crowd To the house, too, through a metal pipe.
7
For Underground wiring two phase Cable or three-phase, if you intend to use high-voltage equipment in the future. Buy counter, the same as the wire is three-phase or two phase. New power grid standards provide grounding in residential buildings.
8
Follow the safety equipment: Do not work during the rain, do not touch the wires with wet hands, follow dry clothes and exercise special boots with rubberized sole. Use special instruments and fixtures. Get out the wiring during construction or repair, because you need to place the wires inside the walls.
9
Perforator or drill Do grooves, label wires and install junction boxes. At the end of the electricity, do not hurry to finish. Call a competent specialist who will examine and approve work. Also for full design and registration counter The system will examine the inspector-master, documenting and assure that all the rules are observed. After installation counter You need to make a call to the appropriate structure and order seal sealing. All, your home is now full and is considered to be residential.
Buying wire, do payment for the future. The technical capabilities are growing, and it is better to install a new wiring, which is designed for 220 W, but by 360 W.