How to register a house in the country area

How to register a house in the country area

If you have your own garden or cottage, then sooner or later you want to see your residential house on it. It is not just comfortable and comfortable, but also will be a good inheritance to children. Of course, for the construction of such large-scale buildings you will need permission. This article considers it in detail when you need this permission, and when you can do without it, ways to get it.



1
What is a construction permit and how to get it

Despite the fact that the site fully belongs to you, the design of the building should also be legally certified, while the house must meet certain requirements and standards, which of course complicates the situation.

To begin with, determine the documents exactly what kind of site type is:

  • Cottage;
  • Or garden.

These concepts are somewhat different, in the garden plot it is allowed to build fewer buildings. After that, deal with the collection of documents for the exhibition permission:

  • Ownership of this area and documents confirming this;
  • In the management company, you can get a planning plan for your land;
  • This also needs to make other documents that imply projector data.

After submitting these documents, the decision is delivered within ten days. The resolution will act ten years.



2
What types of buildings are allowed to erect in the country

Immediately it is worth saying that you do not need to register such buildings:

  • Garages, if not used for commercial activities.
  • Buildings exclusively for gardeners: for example, a shed with a warehouse of wood and tools.
  • Minor buildings are not capitalized: canopies, platforms, swing.
  • Redevelopment or minor changes of already existing on the site of buildings.

Everything else needs to be registered officially, and compliance with the rules will be checked.

3
House requirements in the country area

You will not be issued a building permit if:

  • The borders of the house closer than five meters to the street line and travel. This also applies to household corps;
  • If the fence is not installed with neighbors. Such a fence should be a half meter high and located within your territory;
  • The remaining sections nearby must give their consent to the construction of the structure. For this you or your representative collect signatures;
  • When you are going to upward buildings for the content of small livestock and birds, it must be more than a meter from the rest of the buildings and at a distance of four meters from the neighbors territory;
  • Stocks on other territories are prohibited.

If your home does not correspond to sanitary, fire and building requirements, it is possible not only a refusal of permission, but also the directions of documents to the court, after which you will get a fine. That is why it is worth checking all the documents several times, get permission and only then take for construction. Many daches make a big mistake when they start to build a house at once, without relevant documentation.

4
What other documents will be needed

In addition to the construction permit, you will receive another document: Commissioning. If the first you get even at the planning stage, then the second is issued according to the audit of the compliance of the norms and their execution after construction. However, many managers closes their eyes and give both documents together without subsequent personal checks.

You will need such documents to get a commissioning document:

  • After that, you can contact the technical inventory bureau for the design of cadastral data about your home. It is at this stage that an inspection must be carried out;
  • By collecting all the documentation and paying the state duty, you need to go to the registration chamber, where your home will officially register;
  • After that you will receive a certificate.

Catering construction is not a particularly difficult procedure, especially if you manage to prove that the house is actually an economic, and not a residential. However, the design of some documents still remains inevitable.