If you relatively recently become the owner of the 1C 8.3 software product owner, then, most likely, you wonder how to install it and make a capital setting. It should be understood that the box will be completely useless. If you do not implement. In general, today we will deal in how to set up 1C 8.3.
Step-by-step setting of the program
Immediately, we note that the setup and the introduction of the program itself is carried out conditionally several steps, the main emphasis in this case on the owl is conditionally, which means that in practice some steps from the following may be missed, so have this fact in mind. In fact, the steps are a bit, but each of them needs to be performed in the correct order and with special care.
First we set and fill 1C:
- First of all, set 1C from the box. This kind of process is produced can both in file mode and on the MS SQL server.

- It should be noted that the configuration of the program under consideration can be made one of the first proposed methods (which is more convenient for you or for what you have the opportunity) - in single user mode or on the network.
- Here will also be adapting the technical type of the database, which will be loaded.
- After that, you need to install the protection system and you need to not forget about the keys.
Second Stage - Fill Classifiers:
- Here it will be necessary to fill out the data if necessary, to put various kinds of organizations, not to forget about the course of currencies and all-Russian classifiers (if necessary).
- Be sure to configure the automatic loading of classifiers and other information that is on the server. Do not forget that you will also need to fill out the organization's accounting policy.
At the third stage, the user should do 1C adaptation to account:
- It is necessary to focus that absolutely each enterprise or the organization in any case will have its own details and distinctive features of accounting, as well as the individual specifics of the business itself, precisely because of this, the typical decision of the program has no possibility to satisfy all the needs and reasons for such a situation undoubtedly , understandable.
- It is for this reason that any existing configuration is subject to careful adaptation to accounting. It means that at this stage you need to identify the need of an enterprise and customize the maintenance of the same accounting for these very needs individually.
- Also, at this Tap, it is necessary to make the revision of the standard installed program functional and develop your individual functionality.
- Here it will also be necessary to develop all reports and adjustments. Between the available databases need to be integration.
At the fourth stage, we train users:
- It should be understood that if you have not learned and did not understand the possibilities of the program under consideration, you simply will not be able to take advantage of all its capabilities that it can limit your opportunities in it and make it difficult to work with 1C.
- Whatever competent is not to configure the program, it needs to be able to use anyway, an illiterate specialist here is not a place unambiguously.

- The user who did not figure out the program can easily make a different kind of mistakes, but it will be not so easy to fix them, so it is worth considering this fact.
At the next stage, the user must postpone directory and remnants to a new program:
- If you decide to enter these given manually, then it is best to use the "Entering Data Enter" function.
- In this case, it is also worth considering that in most cases there are a lot of information in old systems, and therefore, a manual input is not a simple, and this input will take a lot of such input. Among other things, you need to take into account the fact that all the remains must be made to the new program exactly in-point.
- You can upload old data into a new system from different systems - galaxy, sail, SAP.
On the sixth stage of the process under consideration, you need to start users, establish rights and, of course, configure them:
- When all previous steps are made, you need to start users (do not forget anyone, at the same time), and then immediately configure the rights.
- It is at this stage, a specialist who deals with this task is often associated with the management, in order to accurately and properly distribute rights.
Last stage - the stage of putting into operation of the program:
- At this stage, all the inaccuracies to be corrected (and they are almost always).
- In addition, here are made consultations on all points of study that were missed previously.
- This process can take up to 6 months, so it is necessary to consider this fact.

The best option - it is entrust such business professionals. Who will do everything quickly, accurately and efficiently. It should be understood that the setting of such a program has many nuances, so there are two options for high-quality work:
- Sort things out on their own, and to do it as thoroughly as possible, that will take time
- Consult the skilled artisan
Only you can decide which of the options to use, the main thing. the end result will meet your expectations.









